• about us
  • waterfalls
  • our travels
  • galleries

where's your sense of adventure?

an eric and leandra production

  • international travel
  • usa travel
  • food & drink
  • street art

posted on August 24, 2011 by eandl

The screened deck, pt.V

Progress in the past month has been extremely slow, but the past two days has finally seen an uptick in activity, with most of the screens installed, stairs, drainage, and the electric complete.

front side
View from the front side walkway- you can see the slats on the inside that will protect the screen from over zealous schnauzers.

back side
view from the back side

interior view
Interior- note the new fan and lights, as well as the furniture (assembled by Leandra and her dad)

In preparation for the potential rain of this weekend gutters were installed today. Hopefully the screen doors and remaining screens will be installed shortly so that we can begin to enjoy the weather as we ease out of summer.

Related posts:

  1. The screened deck, pt.III
  2. The screened deck, pt.IV
  3. The screened deck, pt.II
  4. The screened deck, part I

Tagged With: deck, House, renovation

« business class to Amsterdam!
10 years »

2023 Trips

San Diego (Jan)
Disney World (Feb)
Italy (Apr)
Rugby World Cup (Sept)
Seychelles (Nov)

2022 Trips

Florida (Feb)
NC Mountains (Apr)
Washington DC (Apr)
Valencia, Spain (May)
Hilton Head, SC (May)
Pacific NW (Jun)
Long Island (Jul)
Florida (Sept)
Chicago (Sept)
Poland (Sept)
NC Mountains (Nov)
Euro Xmas Markets (Dec)

2021 Trips

Florida (Apr)
Outer Banks, NC (May)
Long Island (Jul)
NC Mountains (Aug)
Dundee, OR (Sept)
New England (Oct)
Florida (Dec)
Chicago, IL (Dec)

1 Second Everyday: October 2022

Archives

search our blog!

Copyright © 2023 · Divine theme by Restored 316

Copyright © 2023 · Eric + Leandra Ganko