• about us
  • waterfalls
  • our travels
  • galleries

where's your sense of adventure?

an eric and leandra production

  • international travel
  • usa travel
  • food & drink
  • street art

posted on July 9, 2011 by eandl

The screened deck, pt.III

Despite some torrential downpours the sides and roof are now installed completing the major structural work. The light in the living room has dimmed a bit due to the roof, but the deck area itself is surprisingly bright so far. All that recent rain has awoken the mosquito hordes so the sooner the screens go in the better!

side view
View from the side- the door to the BBQ area will be on the far left

front view
View of the front

Framing for the doors, the screen panels, and electrical rough-in are scheduled for early next week.

Related posts:

  1. The screened deck, pt.IV
  2. The screened deck, pt.V
  3. The screened deck, part I
  4. The screened deck, pt.II

Tagged With: deck, House, renovation

« eat and drink in St. Louis
introducing Ava Izabel »

2023 Trips

San Diego (Jan)
Orlando (Feb)
Italy (Apr)
NC Mountains (May)
Rugby World Cup (Sept)
Seychelles (Nov)

2022 Trips

Florida (Feb)
NC Mountains (Apr)
Washington DC (Apr)
Valencia, Spain (May)
Hilton Head, SC (May)
Pacific NW (Jun)
Long Island (Jul)
Florida (Sept)
Chicago (Sept)
Poland (Sept)
NC Mountains (Nov)
Euro Xmas Markets (Dec)

1 Second Everyday: 2022

Archives

search our blog!

Copyright © 2023 · Divine theme by Restored 316

Copyright © 2023 · Eric + Leandra Ganko