• about us
  • waterfalls
  • our travels
  • galleries (coming soon!)

where's your sense of adventure?

an eric and leandra production

  • international travel
  • usa travel
  • food & drink
  • street art

posted on February 19, 2011 by eandl

Bathroom remodel pt.IV

This week drywall was installed and final measurements / templating for our countertop were made. Our new windows arrived and will be installed next week, followed by the shower tiling.

left side
left side

right side
right side

Related posts:

  1. Bathroom remodel pt. III
  2. Bathroom model pt. VII
  3. Bathroom model pt. V
  4. Bathroom remodel, finale

Tagged With: House, renovation

« Soufriere: snorkeling, waterfalls, gardens and mineral baths
Bathroom model pt. V »

2022 Trips

Florida (Feb)
NC Mountains (Apr)
Washington DC (Apr)
Valencia, Spain (May)
Hilton Head, SC (May)
Pacific NW (Jun)
Long Island (Jul)
Lake Winnebago, WI (Aug)
Chicago (Aug)

2021 Trips

Florida (Apr)
Outer Banks, NC (May)
Long Island (Jul)
NC Mountains (Aug)
Dundee, OR (Sept)
New England (Oct)
Florida (Dec)
Chicago, IL (Dec)

1 Second Everyday: May 2022

Archives

search our blog!

Copyright © 2022 · Divine theme by Restored 316

Copyright © 2022 · Eric + Leandra Ganko