posted on March 20, 2011 by eandl

Bathroom model pt. VII

Small miscues this week, but good progress toward a finished, working bathroom:

  • Our cabinets were delivered (yeah!) but the stain on each drawer was different (boo!). We are awaiting their replacements.
  • All the remaining counter top was installed
  • The glass for our shower was installed but came with a robe hook that we had dropped from the plans. Thankfully, the installers didn’t charge us for it.
  • After a short delay for parts, plumbing is done and ready for inspection.

right side, nearing completion
right side, nearing completion

left side, just needs paint
Everything installed on the left side

new countertop
The new countertop with everything installed.

granite closeup
Closeup of ‘Blue Eyes’

This week we should have the final inspections and the finish coat of painting. If things go well we will then be done with the bathroom!

Related posts:

  1. Bathroom model pt. V
  2. Bathroom model pt. VI
  3. Bathroom remodel pt.IV
  4. Bathroom remodel, finale

Tagged With: House, renovation

« California coast
wine tasting in Russian River Valley, CA »

2023 Trips

San Diego (Jan)
Orlando (Feb)
Italy (Apr)
NC Mountains (May)
Rugby World Cup (Sept)
Seychelles (Nov)

2022 Trips

Florida (Feb)
NC Mountains (Apr)
Washington DC (Apr)
Valencia, Spain (May)
Hilton Head, SC (May)
Pacific NW (Jun)
Long Island (Jul)
Florida (Sept)
Chicago (Sept)
Poland (Sept)
NC Mountains (Nov)
Euro Xmas Markets (Dec)

1 Second Everyday: 2022

Archives

search our blog!

Copyright © 2023 · Divine theme by Restored 316

Copyright © 2023 · Eric + Leandra Ganko