Bathroom remodel pt. III

by | Feb 10, 2011 | House

Several inspections on behind-the-wall items took place this week. With those complete, drywall and tiling can start next week.

left side
now with insulation

right side
insulated and shower basin sealed.

Tagged with: House | renovation

Our Itinerary

2025 Trips

Buenos Aires, Argentina (Feb)
Bariloche, Argentina (Feb)
Iguazu Falls, Argentina (Feb)
Boston, MA (Apr)
Kathmandu, Nepal (May)
Bhutan (May)

2024 Trips

San Diego, CA (Jan)
Sarasota, FL (Feb)
Madrid, Spain (Mar)
Valencia, Spain (Mar+Apr)
Palma, Mallorca (Apr)
Croatia (May)
Long Island, NY (July)
Faroe Islands (Aug)
London, UK (Sept)
Puglia, Italy (Sept)
Matera, Italy (Oct)
Rome, Italy (Oct)
Mosel Valley, Germany (Oct)
Frankfurt, Germany (Oct)
London, UK (Dec)
Manchester, UK (Dec)

2022 Trips

Florida (Feb)
NC Mountains (Apr)
Washington DC (Apr)
Valencia, Spain (May)
Hilton Head, SC (May)
Pacific NW (Jun)
Long Island (Jul)
Florida (Sept)
Chicago (Sept)
Poland (Sept)
NC Mountains (Nov)
Euro Xmas Markets (Dec)