Bathroom remodel pt.II

by | Feb 2, 2011 | House

We’ve had lots of progress since the first post about the remodel. The plumbing rough-in is complete, and the structure of the room is now taking shape.

the sink / cabinet area
The view through what will be a sliding door. Bamboo finish cabinets will hold a granite counter top with under-mount sinks. You can also see where the old bathroom used to have a window.

Pocket door roughed in
The pocket door frame and new wall to the master bedroom

the left side
the new toilet will have a new window above it on the left side of the bathroom

the right side
The new shower stall is now framed in, as is the small window above it

Tagged with: House | renovation

Our Itinerary

2024 Trips

San Diego, CA (Jan)
Sarasota, FL (Feb)
Madrid, Spain (Mar)
Valencia, Spain (Mar+Apr)
Palma, Mallorca (Apr)
Croatia (May)
Faroe Islands (Aug)
London, UK (Sept)
Bari, Italy (Sept)
Rome, Italy (Oct)
Frankfurt, Germany (Oct)

2022 Trips

Florida (Feb)
NC Mountains (Apr)
Washington DC (Apr)
Valencia, Spain (May)
Hilton Head, SC (May)
Pacific NW (Jun)
Long Island (Jul)
Florida (Sept)
Chicago (Sept)
Poland (Sept)
NC Mountains (Nov)
Euro Xmas Markets (Dec)