Where’s Your Sense of Adventure?

eric + leandra travel around the globe

Bathroom model pt. VI

by | Mar 10, 2011 | House

Our cabinet was delayed a week so we’re hoping to have it installed next week. In the meantime we had a sun tunnel and molding installed, plus the walls painted (‘Balmy’ by Sherwin Williams).

sun tunnel

the new sun tunnel makes quite a difference

we have a door

we have door!

molding and paint

paint and trim

granite sample

a sample of the granite against the paint

Tagged with: House | renovation

Our Itinerary

2026 Trips

Parrish, FL (Jan)
Medellin, Colombia (Feb)
Wilmington, NC (Apr)
Madrid, Spain (May)
Asturias, Spain (May)
Galicia, Spain (June)
London, UK (July)
Cotswolds, UK (July)
Long Island, NY (July)
Ireland (Aug)
Vietnam (Nov)
Laos (Nov)
Cambodia (Dec)
Singapore (Dec)