Bathroom model pt. V

by | Feb 28, 2011 | House

The last week was about windows, flooring and tile. Windows went in without a hitch and the tilers worked on the shower area most of the time we were in California. Next up: cabinet and countertop should be installed soon.

windows!
Thankfully it was a warm day…

left side, with new window
New window and the Marmoleum flooring

right side, mostly tiled
New window, shower floor and sides.

Tagged with: House | renovation

Our Itinerary

2025 Trips

Buenos Aires, Argentina (Feb)
Bariloche, Argentina (Feb)
Iguazu Falls, Argentina (Feb)
Boston, MA (Apr)
Kathmandu, Nepal (May)
Bhutan (May)

2022 Trips

Florida (Feb)
NC Mountains (Apr)
Washington DC (Apr)
Valencia, Spain (May)
Hilton Head, SC (May)
Pacific NW (Jun)
Long Island (Jul)
Florida (Sept)
Chicago (Sept)
Poland (Sept)
NC Mountains (Nov)
Euro Xmas Markets (Dec)